How to maintain concrete mixing plant equipment in winter

In the daily production work, in order to ensure that the equipment can run stably for a long time, it is essential for the maintenance of machinery and equipment. However, the maintenance methods of some machinery and equipment are different with the season and climate change, especially in the northern region, the climate changes greatly in the four seasons, and the maintenance methods in summer and winter are quite different. The following is a concrete mixing station equipment as an example to describe how to maintain the winter concrete mixing equipment in northern regions.
The northern winter temperature is relatively low. First of all, it is necessary to take antifreeze measures for all parts of the equipment, especially the main engine part, and to lubricate the stirring shaft. The second is to do the daily cleaning of the equipment. After finishing one day of production, concrete residues inside and outside the main tank mixing tank, including the discharge port, mixing shaft, etc., are cleaned. In winter, the working place of the mixer should be provided with a heating device to keep the room temperature above 0 ° C as much as possible, and the mixer must be allowed to run at no load for at least 30 minutes before starting work.
The transmission system of the batching machine is regularly filled with lubricating oil, and the moisture of the air supply system and pipelines of the batching machine is regularly cleaned to prevent freezing in winter construction. After the construction is completed, the remaining materials in the gravel silos are cleaned up to avoid freezing the next day and delay production.
If the concrete mixing plant is shut down for a long period of time in winter, it is best to start the equipment twice a week for more than half an hour each time. This can prevent frostbite caused by the long-term non-use of the concrete mixing plant equipment, or it will not start.
How to maintain concrete mixing plant equipment in winter(图1)

<< Previous:Analysis of Causes of Overloading Axis Failure in Commercial Concrete Mixing Station
<<  Next:How to ensure the quality of concrete in the production process of concrete mixing station

INFO REQUEST

Simply complete the form below, click submit,you will get the price list and a SANME representative will contact you within one business day.


WeChat:18437125333

Online message Message Product Tel Address

Tel:0086-18437125333/0086-371-86598800

Fax:+86-371-86599393

E-mail: jianxin@zzjxcorp.com

Address:West 200m of Guangwu Road and G310 National Way intersection, Xingyang-Zhengzhou City, Henan Province, 450100 China

FOLLOW US

WeChat:18437125333

INFO REQUEST