Telephone:0086-18437125333/0086-371-86598800   E-Mail:jianxin@zzjxcorp.com
Language
NEWS & EVENTS
Hot push product

Troubleshooting and solution of JS concrete mixer loading system

The complete set of equipment in the concrete mixing plant includes control system, mixing system, batching system, weighing system, material storage system, etc. These working systems cooperate with each other to automatically complete the concrete mixing work and have very high efficiency. . The most important equipment in the mixing system is the concrete mixer, which is the core of the mixing station. The type and performance of the mixer play a decisive role in the production capacity of the whole equipment.
In the complete set of concrete mixing plant, the control system, mixing system, batching system, weighing system, material storage system, etc. are included. These working systems cooperate with each other to automatically complete the mixing of concrete and have very high efficiency. The most important equipment in the mixing system is the concrete mixer, which is the core of the mixing station. The type and performance of the mixer play a decisive role in the production capacity of the whole equipment.
 
If the loading system of the concrete mixer fails, the mixer will not work, which will affect the working efficiency of the whole set of equipment. Therefore, it is especially important to analyze the cause and solve the problem in time when the failure occurs. The following is a case report on the solution of the mixer feeding system. When the hopper of the gear lifting hopper mixer is lowered to the bottom of the pit, if the bottoming fault occurs and the traction wire rope is loosened and the other parts are wound, the limit switch may be damaged, and the new switch needs to be replaced in time. If the action of the limit switch is out of control, it is best to replace the new switch and take measures to prevent moisture.
 
If the upper limit switch of the mixer feeding system fails, it may cause the hopper to stop at the top dead center and continue to rise, causing a topping accident, which may cause damage to the hopper, and may cause damage to the whole machine and cause serious damage. Therefore, the limit switch is the key to the loading system of the concrete mixer. Pay attention to the protection and avoid the flooding caused by flooding and rain. If it is found, the damage should be replaced in time.
Troubleshooting and solution of JS concrete mixer loading system(图1)

<< Previous:Development prospect of continuous concrete mixing plant market
<<  Next: The sheet-like cement silo can be used in a wide range of applications

INFO REQUEST

Simply complete the form below, click submit,you will get the price list and a SANME representative will contact you within one business day.


WeChat:18437125333

Online message Message Product Tel Address

Tel:0086-18437125333/0086-371-86598800

Fax:+86-371-86599393

E-mail: jianxin@zzjxcorp.com

Address:West 200m of Guangwu Road and G310 National Way intersection, Xingyang-Zhengzhou City, Henan Province, 450100 China

FOLLOW US

WeChat:18437125333

INFO REQUEST